Promote /tables, /excel-query, /query-tool, /mid-section-defect from deferred to full shell-governed in-scope routes with canonical redirects, content contracts, governance artifacts, and updated CI gates. Unify all page header gradients to #667eea → #764ba2 and h1 font-size to 24px for visual consistency across all dashboard pages. Remove Native Route-View dev annotations from job-query, excel-query, and query-tool headers. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2.6 KiB
2.6 KiB
MODIFIED Requirements
Requirement: Deferred-route content modernization SHALL remain contract-first
Before deferred routes are cut over to modernized implementations, each route SHALL define filter/query/data-state contracts and critical interaction expectations.
Scenario: Deferred-route contract baseline defined
- WHEN
/tables,/excel-query,/query-tool, or/mid-section-defectenters modernization - THEN a route-level baseline SHALL capture filter input semantics, query payload shape, and critical state expectations
Requirement: Deferred-route implementation SHALL require pre-change confirmation
Each deferred route SHALL complete a route-scoped pre-change confirmation before implementation begins.
Scenario: Route enters implementation queue
- WHEN a deferred route is selected for modernization implementation
- THEN a pre-change confirmation record SHALL exist before any route code changes proceed
- THEN the record SHALL include current route status snapshot, baseline contract references, known-bug baseline reference, and rollback flag plan
Requirement: Deferred-route modernization scope SHALL NOT be limited to already-released routes
Deferred modernization scope SHALL follow the deferred route matrix, even if those routes are currently marked dev.
Scenario: Route status is dev in page registry
- WHEN
/tables,/excel-query,/query-tool, or/mid-section-defectis currentlydev - THEN the route SHALL remain eligible for modernization in this follow-up change
- THEN already-
releasedin-scope routes outside deferred scope SHALL not be reopened by this change unless explicitly required for shared governance wiring
Requirement: Deferred-route cutover SHALL require parity + manual acceptance
Deferred routes SHALL NOT complete cutover without parity evidence and explicit manual sign-off.
Scenario: Parity and sign-off before route progression
- WHEN a deferred route reports implementation complete
- THEN golden fixture parity checks and interaction parity checks SHALL pass
- THEN manual acceptance checklist sign-off SHALL be recorded
- THEN next deferred route cutover SHALL be blocked until sign-off is complete
Requirement: Legacy bug carry-over SHALL be blocked for deferred routes
Known legacy bugs in deferred-route migrated scope SHALL be replayed during acceptance and SHALL block sign-off if reproduced.
Scenario: Deferred-route bug replay gate
- WHEN deferred-route manual acceptance executes
- THEN known-bug replay checks SHALL run
- THEN reproduced known bugs SHALL fail route sign-off and block legacy retirement