# Phased Rollout Plan (Canary)
|
|
|
|
## Feature switch
|
|
|
|
- Primary switch: `PORTAL_SPA_ENABLED`
|
|
- Canary enabled users/groups are routed to `/portal-shell`; others remain on `/` route-based portal.
|
|
|
|
## Phases
|
|
|
|
1. Phase A (Internal): dev/admin users only, 1 day.
|
|
2. Phase B (Canary): 10-20% target users, 2-3 days.
|
|
3. Phase C (Broad): 50% users if gates are green for 24h.
|
|
4. Phase D (Full): 100% after cutover gates pass.
|
|
|
|
## Success thresholds
|
|
|
|
- Route availability (P0): >= 99.9% 2xx/3xx.
|
|
- Client runtime error rate on critical paths: 0 unhandled exceptions.
|
|
- Drawer parity drift: 0 mismatches (admin/non-admin route sets).
|
|
- Wrapper launch success (`launch` telemetry): >= 99%.
|
|
|
|
## Error thresholds (rollback trigger)
|
|
|
|
- P0 route availability < 99.5% in any 30-minute window.
|
|
- Any critical workflow smoke failure.
|
|
- Drawer parity mismatch count > 0 after deployment.
|
|
- Wrapper telemetry error rate >= 2% sustained 30 minutes.
|