Promote /tables, /excel-query, /query-tool, /mid-section-defect from deferred to full shell-governed in-scope routes with canonical redirects, content contracts, governance artifacts, and updated CI gates. Unify all page header gradients to #667eea → #764ba2 and h1 font-size to 24px for visual consistency across all dashboard pages. Remove Native Route-View dev annotations from job-query, excel-query, and query-tool headers. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
36 lines
1.6 KiB
Markdown
36 lines
1.6 KiB
Markdown
# Pre-Change Confirmation Template (Deferred Route)
|
|
|
|
## Rule
|
|
|
|
Before any implementation work begins on a deferred route, a route-scoped pre-change confirmation MUST be recorded and approved. Implementation is BLOCKED until confirmation exists.
|
|
|
|
## Required Fields
|
|
|
|
1. **Route**: The deferred route path (e.g., `/tables`).
|
|
2. **Status Snapshot**: Current route status in page registry (e.g., `dev`, `released`).
|
|
3. **Scope Boundary Check**: Confirmation that the route is listed in `route_scope_matrix.json` as in-scope for this change.
|
|
4. **Contract Baseline Refs**: References to existing route contracts and content contracts that define expected behavior.
|
|
5. **Known-Bug Baseline Ref**: Reference to `known_bug_baseline.json` entry for this route (or confirmation that baseline is initialized).
|
|
6. **Rollback Flag Plan**: Planned feature flag key and rollback strategy for this route's cutover.
|
|
7. **Owner**: The person/team responsible for this route's modernization.
|
|
8. **Date**: Date of confirmation.
|
|
9. **Approved By**: Reviewer who approved the pre-change confirmation.
|
|
|
|
## Template
|
|
|
|
```
|
|
Route: /<route-name>
|
|
Status Snapshot: <dev|released>
|
|
Scope Boundary Check: confirmed in route_scope_matrix.json as in-scope
|
|
Contract Baseline Refs:
|
|
- Route contract: route_contracts.json#/<route-name>
|
|
- Content contract: route_content_contracts.json#/<route-name>
|
|
Known-Bug Baseline Ref: known_bug_baseline.json#/<route-name>
|
|
Rollback Flag Plan:
|
|
- Feature flag: modernization_feature_flags.json#/<route-name>.content_cutover_enabled
|
|
- Rollback strategy: fallback_to_legacy_route
|
|
Owner: <owner>
|
|
Date: <YYYY-MM-DD>
|
|
Approved By: <reviewer>
|
|
```
|