Implement phased modernization infrastructure for transitioning from multi-page legacy routing to SPA portal-shell architecture, plus post-delivery hardening fixes for policy loading, fallback consistency, and governance drift detection. Key changes: - Add route contract enrichment with scope/visibility/compatibility policies - Canonical 302 redirects from legacy direct-entry to /portal-shell/ routes - Asset readiness enforcement and runtime fallback retirement for in-scope routes - Shared feature-flag helpers (env > config > default) replacing duplicated _to_bool - Defensive copy for lru_cached policy payloads preventing mutation corruption - Unified retired-fallback response helper across app and blueprint routes - Frontend/backend route-contract cross-validation in governance gates - Shell CSS token fallback values for routes rendered outside shell scope - Local-safe .env.example defaults with production recommendation comments - Legacy contract fallback warning logging and single-hop redirect optimization Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
1.5 KiB
1.5 KiB
Full Modernization Governance Milestones
Phase Completion Criteria
A phase is complete only when all criteria below are true:
- Route governance: 100% of in-scope routes in
route_scope_matrix.jsonhave valid shell contract metadata and ownership. - Style governance: in-scope route-local styles do not introduce page-global selectors (
:root,body) unless recorded in exception registry. - Quality governance: functional parity, visual checkpoints, accessibility checks, and performance budgets pass at configured gate severity.
- Content safety governance: page-content parity evidence + manual acceptance sign-off exist for each migrated in-scope route.
- Bug carry-over governance: known-bug replay checks for migrated scope do not reproduce legacy defects.
Legacy Deprecation Milestones
- 2026-02-20: route contract CI completeness gate enabled in
warnmode. - 2026-02-27: route contract CI completeness gate promoted to
blockmode. - 2026-03-05: in-scope asset readiness gate promoted to
blockmode. - 2026-03-12: runtime fallback posture retired for in-scope routes in production policy.
- 2026-03-19: unresolved style exceptions past milestone fail modernization review.
Deferred Route Linkage
Deferred routes are not pass/fail criteria in this phase and are handed over to a follow-up change:
/tables/excel-query/query-tool/mid-section-defect
Follow-up change handoff is recorded in openspec/changes/deferred-route-modernization-follow-up/.