Shell Route-View Cutover Rollout Plan

Last updated: 2026-02-11

Objectives

  • Complete no-iframe shell cutover with zero P0 regressions.
  • Keep rollback recovery under 15 minutes.
  • Enforce G1~G7 gate pass before each promotion step.

Phased Rollout

  1. Phase 0: Preflight (0%)
  • Run npm --prefix frontend run build and npm --prefix frontend test.
  • Run gate suite: pytest tests/test_cutover_gates.py tests/test_route_view_migration_baseline.py -q.
  • Validate cutover-gates-report.json is all-pass.
  1. Phase 1: Canary (10%)
  • Enable PORTAL_SPA_ENABLED=true on one canary instance.
  • Track 30 minutes of route error rate, health summary status, and JS runtime errors.
  • Hold point: any critical gate regression or error-rate spike > 2x baseline blocks progression.
  1. Phase 2: Partial (50%)
  • Expand SPA shell to half of instances.
  • Monitor dashboard metrics for at least 60 minutes.
  • Hold point: unresolved P0/P1 on Wave A/B smoke pages.
  1. Phase 3: Full (100%)
  • Enable SPA shell on all instances.
  • Keep heightened monitoring window for 24 hours.
  • Keep rollback kill-switch ready during the full window.

Thresholds

  • HTTP 5xx on shell routes: < 1.0% (5-min window).
  • /health degraded/unhealthy ratio: < 5% of polls.
  • JS runtime errors (pageerror/uncaught): zero critical occurrences.
  • Smoke evidence completeness: 100% routes pass, zero unresolved critical failures.

Hold Points

  • H1: Preflight gate mismatch.
  • H2: Canary route errors exceed threshold.
  • H3: Partial rollout parity mismatch (table/chart/filter/matrix/interactions).
  • H4: Health summary or admin entry regression.